SH 2 — EARTH WORK
79 unique item codes, preserving 79 analysed item variants from the source workbook.
Items in SH 2
- 2.1.1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan…₹129.85
- 2.2.1Earth work by mechinical / manual means in rough excavation, banking excavated earth in layers not exceeding 20cm in…₹395.30
- 2.3.1Banking excavated earth by mechanical / manual means in layers not exceeding 20 cm in depth, breaking clods, watering,…₹197.90
- 2.4Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not exceeding 20 cm…₹5.25
- 2.5Deduct for not watering the excavated earth for banking₹14.25
- 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth,…₹177.50
- 2.7.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth,…₹498.90
- 2.7.2Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth,…₹874.40
- 2.7.3Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth,…₹1,432.95
- 2.8.1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains…₹260.30
- 2.9.1Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not…₹632.95
- 2.9.2Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not…₹1,049.80
- 2.9.3Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not…₹1,523.05
- 2.10.1.1All kinds of soil Pipes, cables etc, not exceeding 80 mm dia.₹215.60
- 2.10.1.2All kinds of soil Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia₹352.15
- 2.10.1.3All kinds of soil Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm₹549.75
- 2.13.1.1Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m,…₹403.30
- 2.13.1.2Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m,…₹998.65
- 2.13.1.3Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m,…₹1,149.10
- 2.13.2.1Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m,…₹603.20
- 2.13.2.2Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m,…₹1,493.60
- 2.13.2.3Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m,…₹1,718.45
- 2.13.3.1Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m,…₹826.80
- 2.13.3.2Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m,…₹2,047.30
- 2.13.3.3Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m,…₹2,355.75
- 2.14.1.1Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 1.5 m in depth but not exceeding…₹729.80
- 2.14.1.2Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 1.5 m in depth but not exceeding…₹867.45
- 2.14.2.1Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 1.5 m in depth but not exceeding…₹1,091.45
- 2.14.2.2Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 1.5 m in depth but not exceeding…₹1,297.40
- 2.14.3.1Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 1.5 m in depth but not exceeding…₹1,496.10
- 2.14.3.2Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 1.5 m in depth but not exceeding…₹1,778.15
- 2.15.1.1Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 3m in depth but not exceeding…₹2,352.25
- 2.16.1Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete.…₹139.95
- 2.16.2Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete.…₹155.30
- 2.16.3Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete.…₹189.65
- 2.17.1Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing…₹151.50
- 2.17.2Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing…₹184.00
- 2.17.3Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing…₹218.20
- 2.18.1Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete.…₹125.80
- 2.18.2Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete.…₹144.10
- 2.18.3Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete.…₹163.15
- 2.19Extra for planking, strutting and packing materials for cavities (in close timbering) if required to be left…₹1,692.45
- 2.20.1Depth not exceeding 1.5 m₹72.05
- 2.20.2Depth exceeding 1.5 m but not exceeding 3 m₹81.60
- 2.20.3Depth exceeding 3 m but not exceeding 4.5 m₹97.25
- 2.21.1Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete…₹66.40
- 2.21.2Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete…₹81.65
- 2.21.3Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete…₹101.85
- 2.22.1Open timbering over areas including strutting, shoring etc. complete. (Measurements to be taken of the face area…₹44.85
- 2.22.2Open timbering over areas including strutting, shoring etc. complete. (Measurements to be taken of the face area…₹54.95
- 2.22.3Open timbering over areas including strutting, shoring etc. complete. (Measurements to be taken of the face area…₹71.30
- 2.23Extra for planking and strutting in open timbering if required to be left permanently in position. (Face area of the…₹872.55
- 2.24.1Extra rates for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as…₹0.20
- 2.24.2Extra rates for quantities of works, executed: In or under foul position, including pumping out water as required₹0.25
- 2.25Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not…₹700.50
- 2.26.1Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All…₹126.80
- 2.26.2Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.…₹227.40
- 2.27Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing…₹2,123.75
- 2.28.1Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal…₹34.15
- 2.29.1Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same. All kinds of soil₹34.60
- 2.30.1All kinds of soil₹82.45
- 2.30.2Ordinary rock₹194.25
- 2.30.3Hard rock (requiring blasting)₹319.30
- 2.30.4Hard rock (blasting prohibited)₹461.30
- 2.31Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm…₹17.60
- 2.32Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.₹8.95
- 2.33.1Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches,…₹532.35
- 2.33.2Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches,…₹2,373.50
- 2.33.3Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches,…₹11,020.15
- 2.33.4Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches,…₹22,075.20
- 2.34.1Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/ Lindane emulsifiable…₹234.75
- 2.35.1.1Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of…₹38.90
- 2.35.2.1Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of…₹53.45
- 2.35.3.1Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of…₹310.05
- 2.35.4.1Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of…₹43.00
- 2.35.5Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of…₹279.70
- 2.36Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge.₹93.05
- 2.37Supply and stacking of Fly ash conforming to IRC- 58 at site, including carriage, loading , unloading & stacking up to…₹281.05
- 2.38Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not…₹308.20