DSR 2023 · SH 2 · EARTH WORK

CPWD DSR item 2.35.3.1 rate analysis

Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration

Published rate₹310.05per square metre
Rate analysis

Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:

DSR rate₹310.05per square metre

With Chlorpyriphos/Lindane E.C. 20% with 1% concentration

Item code
2.35.3.1
Sub-head
SH 2 · EARTH WORK
Unit
square metre
Source row
1996

Cost components

CodeDescriptionUnitQuantityRateAmount
Details of cost for 9 sqm. (3 metre x 3 metre)
No. of holes - 100 nos.
MATERIAL
Chlorpyriphos 1% required 100x1 litre = 100 litres
Chlorpyriphos 20% E.C. = 100/20 = 5.0 litres
Chlorpyriphos 20% E.C. / Lindane 20% E.C. 5 litres (to be supplied free of cost)
LABOUR
0114 Beldar day 2 ₹736.00 ₹1,472.00
(For making holes & spraying)
0124 Mason 2nd class day 0.5 ₹816.00 ₹408.00
9999 Sundries, rent of sprayer and mortar L.S. 35.88 ₹2.27 ₹81.45

Rate build-up

TOTAL ₹1,961.45
Add 1 % Water charges on "W" ₹19.61
TOTAL ₹1,981.06
Add GST on "X" (multiplying factor 0.2127) ₹421.37
TOTAL ₹2,402.43
Add 15% CPOH on "Y" ₹360.36
TOTAL ₹2,762.79
Add Cess @ 1% on "Z" ₹27.63
Cost for 9 square metre ₹2,790.42
Cost per square metre ₹310.05
Say ₹310.05