DSR 2023 · SH 15 · DISMANTLING

CPWD DSR item 15.44.2 rate analysis

Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge : Above 40 mm nominal bore

Published rate₹161.40DSR 2023
Rate analysis

Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge :

DSR rate₹161.40as per item analysis

Above 40 mm nominal bore

Item code
15.44.2
Sub-head
SH 15 · DISMANTLING
Unit
See analysis
Source row
1294

Cost components

CodeDescriptionUnitQuantityRateAmount
Detail of cost for 10 metre
LABOUR
Trenching and refilling etc
0114 Beldar day 0.66 ₹736.00 ₹485.76
0115 Coolie day 0.66 ₹736.00 ₹485.76
9999 Dismantling G.I. pipe and stacking etc L.S. 71.76 ₹2.27 ₹162.90

Rate build-up

TOTAL ₹1,134.42
Add 1 % Water charges on "W" ₹11.34
TOTAL ₹1,145.76
Add GST on "X" (multiplying factor 0.2127) ₹243.70
TOTAL ₹1,389.46
Add 15% CPOH on "Y" ₹208.42
TOTAL ₹1,597.88
Add Cess @ 1% on "Z" ₹15.98
Cost of 10.00 metre ₹1,613.86
Cost of 1.00 metre ₹161.39
Say ₹161.40

Use this rate in the interactive workbook