DSR 2023 · SH 15 · DISMANTLING

CPWD DSR item 15.44.1 rate analysis

Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge : 15 mm to 40 mm nominal bore

Published rate₹149.80DSR 2023
Rate analysis

Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge :

DSR rate₹149.80as per item analysis

15 mm to 40 mm nominal bore

Item code
15.44.1
Sub-head
SH 15 · DISMANTLING
Unit
See analysis
Source row
1294

Cost components

CodeDescriptionUnitQuantityRateAmount
Detail of cost for 10 metre
LABOUR
Trenching and refilling etc
0114 Beldar day 0.66 ₹736.00 ₹485.76
0115 Coolie day 0.66 ₹736.00 ₹485.76
9999 Dismantling G.I. pipe and stacking etc L.S. 35.88 ₹2.27 ₹81.45

Rate build-up

TOTAL ₹1,052.97
Add 1 % Water charges on "W" ₹10.53
TOTAL ₹1,063.50
Add GST on "X" (multiplying factor 0.2127) ₹226.21
TOTAL ₹1,289.71
Add 15% CPOH on "Y" ₹193.46
TOTAL ₹1,483.17
Add Cess @ 1% on "Z" ₹14.83
Cost of 10.00 metre ₹1,498.00
Cost of 1.00 metre ₹149.80
Say ₹149.80

Use this rate in the interactive workbook

Search, temporarily edit basic rates, recalculate dependencies, and export from the existing DSR workbook.

Open DSR Workbook