DSR 2023 · SH 5 · REINFORCED CEMENT CONCRETE

CPWD DSR item 5.14A rate analysis

Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete in mouldings as in cornices, windows sills etc. including setting in cement mortar 1:3 (1 cement : 3 coarse sand) cost of required centering, shuttering but excluding the cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand incuding manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 20% : 3 graded stone aggregate 20 mm nominal size including Recycled Concrete Aggregate (RCA) upto 20%).

Published rate₹18,064.15per cum
Rate analysis

Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete in mouldings as in cornices, windows sills etc. including setting in cement mortar 1:3 (1 cement : 3 coarse sand) cost of required centering, shuttering but excluding the cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand incuding manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 20% : 3 graded stone aggregate 20 mm nominal size including Recycled Concrete Aggregate (RCA) upto 20%).

DSR rate₹18,064.15per cum
Item code
5.14A
Sub-head
SH 5 · REINFORCED CEMENT CONCRETE
Unit
cum
Source row
1924

Cost components

CodeDescriptionUnitQuantityRateAmount
Details of cost for 10x 1 x 0.20 x 0.15 = 0.3 cum
MATERIAL:
Cement concrete 1:1.5:3
Sub AR-1 Rate as per sub AR-1 (Ref item no 4.1.2) cum 0.3 ₹8,170.05 ₹2,451.02
Extra labour for lifting above FL II upto FL V
0.3 x 1.5x0.75 = 0.34
0115 Coolie day 0.34 ₹736.00 ₹250.24
9999 Mortar and labour for hoisting and for fixing L.S. 27.3 ₹2.27 ₹61.97
Centring and shuttering
4.3.1 Rate as per Item Number 4.3.1 of SH: Concrete work sqm 3.6 ₹392.15 ₹1,411.74
53.82x0.3 = 16.1
9999 Add for extra labour for hoisting L.S. 16.1 ₹2.27 ₹36.55
LABOUR:
Add Extra labour for moulding
0123 Mason 1st class day 0.174 ₹897.00 ₹156.08
0.58x0.3=0.174
0124 Mason 2nd class day 0.174 ₹816.00 ₹141.98
0.58x0.3=0.174
0115 Coolie day 0.45 ₹736.00 ₹331.20
1.5x0.3=0.450
0101 Bhisti day 0.018 ₹816.00 ₹14.69
0.06x0.3=0.018
Extra labour for laying CC in RCC
0114 Beldar day 0.03 ₹736.00 ₹22.08
0.1x0.3=0.030
0101 Bhisti day 0.06 ₹816.00 ₹48.96
0.2x0.3=0.060
0123 Mason 1st class day 0.012 ₹897.00 ₹10.76
0.04x0.3=0.012
0124 Mason 2nd class day 0.012 ₹816.00 ₹9.79
0.04x0.3=0.012
0128 Mate day 0.012 ₹816.00 ₹9.79
0.04x0.3=0.012

Rate build-up

Total ₹4,956.85
Add 1 % Water charges on "W-A" ₹10.94
TOTAL ₹4,967.79
Add GST on "X-A" (multiplying factor 0.2127) ₹235.04
TOTAL ₹5,202.83
Add 15% CPOH on "Y-A" ₹201.01
TOTAL ₹5,403.84
Add Cess @ 1% on "Z-A" ₹15.41
Cost of 0.3 cum ₹5,419.25
Cost of 1 cum ₹18,064.17
Say ₹18,064.15