Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:
1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Published rate₹10,357.55per cum
Rate analysis
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:
DSR rate₹10,357.55per cum
1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Item code
4.2.2
Sub-head
SH 4 · CONCRETE WORK
Unit
cum
Source row
594
Cost components
Code
Description
Unit
Quantity
Rate
Amount
Details of cost for 1 cum.
MATERIAL
0295
Stone Aggregate (Single size) : 20 mm nominal size
cum
0.57
₹1,425.00
₹812.25
0297
Stone Aggregate (Single size) : 10 mm nominal size
cum
0.28
₹1,400.00
₹392.00
2202
Carriage of Stone aggregate below 40 mm nominal size
cum
0.85
₹0.00
₹0.00
0982
Coarse sand (zone III)
cum
0.425
₹1,450.00
₹616.25
2203
Carriage of Coarse sand
cum
0.425
₹0.00
₹0.00
0367
Portland Cement (0.2833 cum)
tonne
0.4
₹5,156.00
₹2,062.40
2209
Carriage of Cement
tonne
0.4
₹0.00
₹0.00
LABOUR
0114
Beldar
day
0.9
₹736.00
₹662.40
0115
Coolie
day
0.78
₹736.00
₹574.08
0101
Bhisti
day
0.7
₹816.00
₹571.20
0123
Mason (brick layer) 1st class
day
0.06
₹897.00
₹53.82
0124
Mason (brick layer) 2nd class
day
0.06
₹816.00
₹48.96
0002
Hire charges of Concrete Mixer 0.25 to 0.40 cum with hooper
day
0.07
₹900.00
₹63.00
0012
Vibrator(Needle type 40mm)
day
0.07
₹400.00
₹28.00
9999
Scaffolding
L.S.
114.4
₹2.27
₹259.69
9999
Sundries
L.S.
14.3
₹2.27
₹32.46
(Extra labour for lifting material upto floor V level = 0.75 x 2.0 = 1.50)
0115
Coolie
day
1.5
₹736.00
₹1,104.00
Rate build-up
TOTAL
₹7,280.51
Add 1 % Water charges on "W"
₹72.81
TOTAL
₹7,353.32
Add GST on "X" (multiplying factor 0.2127)
₹1,564.05
TOTAL
₹8,917.37
Add 15% CPOH on "Y"
₹1,337.61
TOTAL
₹10,254.98
Add Cess @ 1% on "Z"
₹102.55
Cost of 1 cum.
₹10,357.53
Say
₹10,357.55