Providing and installation of factory made Structural Stay in place form work system with double faced panels for walls, single faced panels for roof/ floor slabs, L-shaped single faced panels for corners, with necessary scaffolding, struts, bracing etc. Complete as per CPWD specification and directions of the Engineer in Charge. Design of walls and other members to be provided by the supplier & shall be duly vetted by any engineering institute of National repute such as IITs, NITs etc. and nothing extra shall be payable on this account (Additional steel reinforcement/dowels, design mix concrete of specified grade, electrical and plumbing conduits insert for services and plastering on either side of walls shall be paid for separately). Note:- This item shall be adopted for building upto G+3 Storeys only excluding seismic zone V.
Single panel for slabs with minimum weight of panel as 4.05 kg/sqm for walls with corresponding corners and jambs strips.
Published rate₹1,713.55per sqm
Rate analysis
Providing and installation of factory made Structural Stay in place form work system with double faced panels for walls, single faced panels for roof/ floor slabs, L-shaped single faced panels for corners, with necessary scaffolding, struts, bracing etc. Complete as per CPWD specification and directions of the Engineer in Charge. Design of walls and other members to be provided by the supplier & shall be duly vetted by any engineering institute of National repute such as IITs, NITs etc. and nothing extra shall be payable on this account (Additional steel reinforcement/dowels, design mix concrete of specified grade, electrical and plumbing conduits insert for services and plastering on either side of walls shall be paid for separately). Note:- This item shall be adopted for building upto G+3 Storeys only excluding seismic zone V.
DSR rate₹1,713.55per sqm
Single panel for slabs with minimum weight of panel as 4.05 kg/sqm for walls with corresponding corners and jambs strips.
Item code
26.95.2
Sub-head
SH 26 · NEW TECHNOLOGIES AND
Unit
sqm
Source row
5206
Cost components
Code
Description
Unit
Quantity
Rate
Amount
Details of cost for 15 sqm
MATERIALS
8995
Single panel (Weight not less than 4.05 kg/sqm)
Sqm
15
₹832.00
₹12,480.00
9999
Transportation of panel
L.S.
35.3
₹2.27
₹80.13
8724
12 mm thick marine plywood
Sqm
3.25
₹785.00
₹2,551.25
Assuming Strengthening of panels material (structs,bracis and propes) will become unserviceable after use of 40 times, adding for maintenance @ 10% of cost, taking salvage value after full use of material @ 30% cost.
7343
Adjustable telescopic prop 3 m (2.02 - 3.75 m)
each
0.9
₹1,051.00
₹945.90
Telescopping to support horizantel single panel stay in place form work for slabs 3 m long adjustable telescopic propes = 36 Nos.
Quantity for using once = 36 /40 = 0.90 No.
—
Add Maintenance charges @ 10% of P
—
—
—
₹94.59
—
Deduct salvage value @ 30% of bare cost of material on P
—
—
—
-₹283.77
8994
G.I binding wire
Kg
1.5
₹66.00
₹99.00
1219
Nails 75 mm
Kg
1.5
₹58.00
₹87.00
LABOUR
0116
Fitter (Grade-I)
Day
1.2
₹897.00
₹1,076.40
0114
Beldar
Day
1.2
₹736.00
₹883.20
9999
Sundries
L.S
23.59
₹2.27
₹53.55
Rate build-up
TOTAL
₹18,067.25
Add 1 % Water charges on "W"
₹180.67
TOTAL
₹18,247.92
Add GST on "X" (multiplying factor 0.2127)
₹3,881.33
TOTAL
₹22,129.25
Add 15% CPOH on “Y”
₹3,319.39
TOTAL
₹25,448.64
Add Labour Cess @ 1% on “Z”
₹254.49
Cost of 15 sqm
₹25,703.13
Cost of 1 sqm
₹1,713.54
Say
₹1,713.55
Use this rate in the interactive workbook
Search, temporarily edit basic rates, recalculate dependencies, and export from the existing DSR workbook.