Providing and installation of factory made Structural Stay in place form work system with double faced panels for walls, single faced panels for roof/ floor slabs, L-shaped single faced panels for corners, with necessary scaffolding, struts, bracing etc. Complete as per CPWD specification and directions of the Engineer in Charge. Design of walls and other members to be provided by the supplier & shall be duly vetted by any engineering institute of National repute such as IITs, NITs etc. and nothing extra shall be payable on this account (Additional steel reinforcement/dowels, design mix concrete of specified grade, electrical and plumbing conduits insert for services and plastering on either side of walls shall be paid for separately). Note:- This item shall be adopted for building upto G+3 Storeys only excluding seismic zone V.
Double panel of required thickness (110mm & above) with minimum weight of panel as 11.05 kg per sqm for walls with corresponding corners and jambs strips.
Published rate₹3,189.10per sqm
Rate analysis
Providing and installation of factory made Structural Stay in place form work system with double faced panels for walls, single faced panels for roof/ floor slabs, L-shaped single faced panels for corners, with necessary scaffolding, struts, bracing etc. Complete as per CPWD specification and directions of the Engineer in Charge. Design of walls and other members to be provided by the supplier & shall be duly vetted by any engineering institute of National repute such as IITs, NITs etc. and nothing extra shall be payable on this account (Additional steel reinforcement/dowels, design mix concrete of specified grade, electrical and plumbing conduits insert for services and plastering on either side of walls shall be paid for separately). Note:- This item shall be adopted for building upto G+3 Storeys only excluding seismic zone V.
DSR rate₹3,189.10per sqm
Double panel of required thickness (110mm & above) with minimum weight of panel as 11.05 kg per sqm for walls with corresponding corners and jambs strips.
Item code
26.95.1
Sub-head
SH 26 · NEW TECHNOLOGIES AND
Unit
sqm
Source row
5206
Cost components
Code
Description
Unit
Quantity
Rate
Amount
Details of cost for 450 sqm
MATERIALS
8991
Standard double panel of design width, height and thickness
sqm
440
₹2,071.00
₹9,11,240.00
8992
Corner pieces L-Shape
sqm
10
₹813.00
₹8,130.00
8993
Flat strips for soffits (L.S.)
sqm
20
₹832.00
₹16,640.00
9999
Transportation of panel
L.S.
2,122.64
₹2.27
₹4,818.39
Assuming Strengthening of panels material (structs,bracis and propes) will become unserviceable after use of 40 times, adding for maintenance @ 10% of cost, taking salvage value after full use of material @ 30% cost.
4009
Mile Steel tubes hot finished welded type
kg
147.45
₹72.00
₹10,616.40
For diagonal Bracing on outer face 60mm dia M.S Pipe (5 to 6 m long) = 600 metre @ 5.54 kg/m = 3324 kg
50mm dia, M.S pipes for shorter length outer bracing and internal bracing. = 650 metre @ 3.96 kg/m = 2574 kg
Total Weight = 5898 kg
Quantity for using Once = 5898 / 40 = 147.45 kg
—
Add Maintenance charges @ 10% of P
—
—
—
₹1,061.64
—
Deduct salvage value @ 30% of bare cost of material on P
—
—
—
-₹3,184.92
8724
12 mm thick marine plywood
sqm
12
₹785.00
₹9,420.00
8994
G.I binding wire
Kg
25
₹66.00
₹1,650.00
1219
Nails 75 mm
Kg
15
₹58.00
₹870.00
LABOUR
0116
Fitter (Grade-I)
Day
20
₹897.00
₹17,940.00
0114
Beldar
Day
40
₹736.00
₹29,440.00
9999
Sundries
L.S
54.24
₹2.27
₹123.12
Rate build-up
TOTAL
₹10,08,764.63
Add 1 % Water charges on "W"
₹10,087.65
TOTAL
₹10,18,852.28
Add GST on "X" (multiplying factor 0.2127)
₹2,16,709.88
TOTAL
₹12,35,562.16
Add 15% CPOH on “Y”
₹1,85,334.32
TOTAL
₹14,20,896.48
Add Labour Cess @ 1% on “Z”
₹14,208.96
Cost for 450 sqm
₹14,35,105.44
Cost of 1 sqm
₹3,189.12
Say
₹3,189.10
Use this rate in the interactive workbook