Rate analysis
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.
DSR rate₹3.85as per item analysis
- Item code
- 15.19
- Sub-head
- SH 15 · DISMANTLING
- Unit
- See analysis
- Source row
- 633
Cost components
| Code | Description | Unit | Quantity | Rate | Amount |
|---|---|---|---|---|---|
| Detail of cost for 1 quintal | |||||
| LABOUR | |||||
| 0100 | Bandhani | day | 0.1 | ₹816.00 | ₹81.60 |
| 0114 | Beldar | day | 0.25 | ₹736.00 | ₹184.00 |
| 9999 | Sundries | L.S. | 2.73 | ₹2.27 | ₹6.20 |
Rate build-up
| TOTAL | ₹271.80 |
| Add 1 % Water charges on "W" | ₹2.72 |
| TOTAL | ₹274.52 |
| Add GST on "X" (multiplying factor 0.2127) | ₹58.39 |
| TOTAL | ₹332.91 |
| Add 15% CPOH on "Y" | ₹49.94 |
| TOTAL | ₹382.85 |
| Add Cess @ 1% on "Z" | ₹3.83 |
| Cost of 1.00 quintal | ₹386.68 |
| Cost of 1.00 kg | ₹3.87 |
| Say | ₹3.85 |