DSR 2023 · SH 9 · WOOD & PVC WORK

CPWD DSR item 9.141 rate analysis

Providing and fixing PVC Door Frame of size 50x47 mm with a wall thickness of 5 mm (± 0.2 mm), made out of single piece extruded PVC profile, with mitred cut joints and joint with 2 nos of PVC bracket of size 190 mm x 100 mm long arms of cross section size 35 x 15 mm & self driven self taping screws, the vertical door profiles to be reinforced with 40x20 mm M.S. rectangular tube of 0.8 mm , including providing EPDM rubber gasket weather seal throughout the frame, including jointing 5 mm PVC frame strip with PVC solvent cement on the back of the profile. The door frame to be fixed to the wall using 8 x100 mm long anchor fasteners complete, all as per manufacturer's specification and direction of Engineer -in- charge.

Published rate₹573.45per metre
Rate analysis

Providing and fixing PVC Door Frame of size 50x47 mm with a wall thickness of 5 mm (± 0.2 mm), made out of single piece extruded PVC profile, with mitred cut joints and joint with 2 nos of PVC bracket of size 190 mm x 100 mm long arms of cross section size 35 x 15 mm & self driven self taping screws, the vertical door profiles to be reinforced with 40x20 mm M.S. rectangular tube of 0.8 mm , including providing EPDM rubber gasket weather seal throughout the frame, including jointing 5 mm PVC frame strip with PVC solvent cement on the back of the profile. The door frame to be fixed to the wall using 8 x100 mm long anchor fasteners complete, all as per manufacturer's specification and direction of Engineer -in- charge.

DSR rate₹573.45per metre
Item code
9.141
Sub-head
SH 9 · WOOD & PVC WORK
Unit
metre
Source row
7805

Cost components

CodeDescriptionUnitQuantityRateAmount
Details of cost for one door frame of 5 metre
MATERIAL
8014 Factory made door frame of size 50x47mm with wall thickness 5 mm made of single piecs extruded profile meter 5 ₹350.00 ₹1,750.00
LABOUR
0156 Carpenter (average) day 0.15 ₹857.00 ₹128.55
0114 Beldar day 0.15 ₹736.00 ₹110.40
9999 Sundries L.S. 11.65 ₹2.27 ₹26.45

Rate build-up

TOTAL ₹2,015.40
Add 1 % Water charges on "W" ₹20.15
TOTAL ₹2,035.55
Add GST on "X" (multiplying factor 0.2127) ₹432.96
TOTAL ₹2,468.51
Add 15% CPOH on "Y" ₹370.28
TOTAL ₹2,838.79
Add Cess @ 1% on "Z" ₹28.39
Cost of 5 metres ₹2,867.18
Cost of 1 metre ₹573.44
Say ₹573.45