DSR 2023 · SH 22 · WATER PROOFING

CPWD DSR item 22.4.3 rate analysis

Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : Kickers (320 mm wide, 5 mm thick)

Published rate₹263.65DSR 2023
Rate analysis

Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete :

DSR rate₹263.65as per item analysis

Kickers (320 mm wide, 5 mm thick)

Item code
22.4.3
Sub-head
SH 22 · WATER PROOFING
Unit
See analysis
Source row
156

Cost components

CodeDescriptionUnitQuantityRateAmount
Details of cost for 100 metres
MATERIAL
7429 Kickers metre 100 ₹170.00 ₹17,000.00
LABOUR
0114 Beldar day 2 ₹736.00 ₹1,472.00
9999 Sundries & wire etc. L.S. 26 ₹2.27 ₹59.02

Rate build-up

TOTAL ₹18,531.02
Add 1 % Water charges on "W" ₹185.31
TOTAL ₹18,716.33
Add GST on "X" (multiplying factor 0.2127) ₹3,980.96
TOTAL ₹22,697.29
Add 15% CPOH on "Y" ₹3,404.59
TOTAL ₹26,101.88
Add Cess @ 1% on "Z" ₹261.02
Cost for 100 metres ₹26,362.90
Cost for 1 metre ₹263.63
Say ₹263.65