Providing and fixing M.S. holder bat clamp of approved design to sand cast iron/ cast iron (spun) pipes comprising of M.S. flat brackets made of 50x5 mm flat of specified shape, projecting 75 mm outside the wall surface and fixed on wall with 4nos, 6mm dia expansion hold fasteners, including drilling necessary holes in brick wall/ CC/ RCC surface and the cost of bolts etc. The pipes shall be fixed to the already fixed brackets with the help of 30 mm x1.6 mm galvanised M.S. flats of specified shape and of total length 420 mm and shall be fixed with M.S. nuts, bolts, & washers of size 25x6 mm, one bolts on each side of the pipe.
Total bracket length 580 mm of approved shape and design (for single 100 mm dia pipe)
Published rate₹304.05DSR 2023
Rate analysis
Providing and fixing M.S. holder bat clamp of approved design to sand cast iron/ cast iron (spun) pipes comprising of M.S. flat brackets made of 50x5 mm flat of specified shape, projecting 75 mm outside the wall surface and fixed on wall with 4nos, 6mm dia expansion hold fasteners, including drilling necessary holes in brick wall/ CC/ RCC surface and the cost of bolts etc. The pipes shall be fixed to the already fixed brackets with the help of 30 mm x1.6 mm galvanised M.S. flats of specified shape and of total length 420 mm and shall be fixed with M.S. nuts, bolts, & washers of size 25x6 mm, one bolts on each side of the pipe.
DSR rate₹304.05as per item analysis
Total bracket length 580 mm of approved shape and design (for single 100 mm dia pipe)
Item code
17.77.1
Sub-head
SH 17 · SANITARY INSTALLATIONS
Unit
See analysis
Source row
4561
Cost components
Code
Description
Unit
Quantity
Rate
Amount
Details of cost for 50 nos.
MATERIAL
M.S. flats 50x5mm= 50 x 0.58 = 29m
@ 1.97 kg/ metre = 57.1 kg.
M.S. flats 30x1.6mm= 50x0.42 = 21m.
0.38kg/metre = 8kg.
Total = 65.1kg.
Add wastage 5% = 3.3kg.
Total = 68.6 kg.= 0.686 quintal
1007
Structurals such as tees,angles channels and R.S. joists
quintal
0.686
₹5,965.00
₹4,091.99
2205
Carriage of Steel
tonne
0.068
₹0.00
₹0.00
LABOUR
0116
Fitter (grade 1)
day
0.33
₹897.00
₹296.01
0103
Blacksmith 2nd class
day
0.49
₹816.00
₹399.84
0114
Beldar
day
0.65
₹736.00
₹478.40
priming coat
50x0.58x0.11 = 3.19
5x0.42x0.063 = 1.32
Total=4.51sqm
13.85.1
Rate as per item no 13.85.1 of SH : Finishing
sqm
4.51
₹70.35
₹317.28
9999
Sundries
L.S.
13.5
₹2.27
₹30.65
P/F expansion hold fasteners 6mm threaded dia= 50x4 Nos = 200 nos.
8.8.1.1
Rate asper item no. 8.8.1.1 of SH :- Marble work
each
200
₹36.75
₹7,350.00
Rate build-up
TOTAL
₹12,964.17
Add 1 % Water charges on "W-A"
₹52.97
TOTAL
₹13,017.14
Add GST on "X-A" (multiplying factor 0.2127)
₹1,137.92
TOTAL
₹14,155.06
Add 15% CPOH on "Y-A"
₹973.17
TOTAL
₹15,128.23
Add Cess @ 1% on "Z-A"
₹74.61
Cost of 50 Nos.
₹15,202.84
Cost of each
₹304.06
Say
₹304.05
Use this rate in the interactive workbook