Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge.
50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.
Published rate₹11,129.55per cum
Rate analysis
Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge.
DSR rate₹11,129.55per cum
50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.
Item code
16.54.1
Sub-head
SH 16 · ROAD WORK
Unit
cum
Source row
3230
Cost components
Code
Description
Unit
Quantity
Rate
Amount
Details of cost for 195 cum (or 450 M.T. )
MATERIAL
7309
Paving Asphalt VG-30 of approved quality (percentage by weight of total mix)
tonne
22.5
₹41,202.00
₹9,27,045.00
2211
Carriage of Tar bitumen
tonne
22.5
₹0.00
₹0.00
Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 22.50 tonnes
Weight of aggregate = 450 -22.50 = 427.50 tonnes
Taking density of aggregate = 1.5 tonne/cum
Volume of aggregate =427.50/1.5 =285cum
Grading - II/19 mm (Nominal Size)
25 - 10mm size = 30% of 285 = 85.5 cum
10 - 5mm size = 28% of 285 = 79.8 cum
5mm and below = 40% of 285 = 114 cum
0294
Stone Aggregate (Single size) : 25 mm nominal size
cum
42.75
₹1,400.00
₹59,850.00
Qty = 85.5 * 50 /100
0297
Stone Aggregate (Single size) : 10 mm nominal size
cum
42.75
₹1,400.00
₹59,850.00
Qty = 85.5 * 50 /100
0297
Stone Aggregate (Single size) : 10 mm nominal size
cum
39.9
₹1,400.00
₹55,860.00
Qty = 79.8 * 50 /100
0298
Stone Aggregate (Single size) : 06 mm nominal size
cum
39.9
₹1,425.00
₹56,857.50
Qty = 79.8 * 50 /100
2903
Stone chippings/ screenings 4.75 mm nominal size
cum
114
₹1,600.00
₹1,82,400.00
Qty = 285 * 40 /100
2202
Carriage of Stone aggregate below 40 mm nominal size
cum
279.3
₹0.00
₹0.00
Lime Filler @ 2% ( percentage by weight of aggregate)
0777
Dry hydrated lime (factory made)
quintal
85.5
₹315.00
₹26,932.50
2208
Carriage of Lime
cum
6.63
₹0.00
₹0.00
(consitering density of lime as 1.29 T per cum) V =8.55/1.29 = 6.63 cum
MACHINERY/ HIRE CHARGES:
0062
Hot mix Plant -120 TPH capacity
hour
3
₹16,800.00
₹50,400.00
0063
Hot mix Plant 100 TPH Capacity
hour
3
₹14,550.00
₹43,650.00
0064
Paver finisher Hydrostatic with sensor control 100 TPH
hour
6
₹1,700.00
₹10,200.00
0069
Generator 250 KVA
hour
6
₹450.00
₹2,700.00
0052
Front end loader 1 cum bucket capacity (incl POL)
hour
6
₹1,450.00
₹8,700.00
0053
Tipper -5 Cum
tonne/km
4,500
₹3.70
₹16,650.00
—
Add 10 per cent of cost of carriage to cover cost of loading and unloading
—
—
—
₹0.00
0055
Smooth Wheeled Roller 8 to 10 tonne
hour
3.9
₹350.00
₹1,365.00
for initial break down rolling.(6*0.65)
0054
Vibratory roller 8 to 10 tonne
hour
3.9
₹700.00
₹2,730.00
for intermediate rolling.(6*0.65)
0056
Tandem Road Roller
hour
3.9
₹1,350.00
₹5,265.00
Finish rolling with 6-8 tonnes smooth wheeled tandem roller.(6*0.65)
LABOUR
0128
Mate
day
0.84
₹816.00
₹685.44
0114
Beldar
day
14
₹736.00
₹10,304.00
working with HMP, mechanical broom, paver, roller, asphalt cutter and assistance for setting out lines, levels and layout of construction
0139
Skilled Beldar (for floor rubbing etc.)
day
5
₹816.00
₹4,080.00
for checking line & levels
Rate build-up
TOTAL
₹15,25,524.44
Add 1 % Water charges on "W"
₹15,255.24
TOTAL
₹15,40,779.68
Add GST on "X" (multiplying factor 0.2127)
₹3,27,723.84
TOTAL
₹18,68,503.52
Add 15% CPOH on "Y"
₹2,80,275.53
TOTAL
₹21,48,779.05
Add Cess @ 1% on "Z"
₹21,487.79
Cost for 195 cum(450 M.T.)
₹21,70,266.84
Cost per cum.
₹11,129.57
Say
₹11,129.55
Use this rate in the interactive workbook