Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade, including required key aggregate as specified, spreading coarse aggregate with the help of self propelled/ tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete, including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy :
For 75 mm compacted thickness in two layers using stone aggregate of size 63-41 mm graded @ 0.90 cum per 10 sqm key aggregate of size 20.0 mm graded @ 0.18 cum per 10 sqm. With paving asphalt grade VG - 10 @ 68 kg/10 sqm.
Published rate₹744.15per sqm
Rate analysis
Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade, including required key aggregate as specified, spreading coarse aggregate with the help of self propelled/ tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete, including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy :
DSR rate₹744.15per sqm
For 75 mm compacted thickness in two layers using stone aggregate of size 63-41 mm graded @ 0.90 cum per 10 sqm key aggregate of size 20.0 mm graded @ 0.18 cum per 10 sqm. With paving asphalt grade VG - 10 @ 68 kg/10 sqm.
Item code
16.36.2
Sub-head
SH 16 · ROAD WORK
Unit
sqm
Source row
1980
Cost components
Code
Description
Unit
Quantity
Rate
Amount
Details of cost for 300 sqm.
MATERIAL
Taking output as 300 sqm. for single layer.
Coarse agg. = 300/10x0.90 = 27 cum.
Key agg = 300/10x0.18 = 5.4 cum.
Bitumen = 300/10x68 = 2.04 t.
2206
Carriage of Stone aggregate 40 mm nominal size and above
cum
8.1
₹0.00
₹0.00
0292
Stone Aggregate (Single size) : 50 mm nominal size
cum
8.1
₹1,100.00
₹8,910.00
0295
Stone Aggregate (Single size) : 20 mm nominal size
cum
14.58
₹1,425.00
₹20,776.50
0297
Stone Aggregate (Single size) : 10 mm nominal size
cum
4.32
₹1,400.00
₹6,048.00
0294
Stone Aggregate (Single size) : 25 mm nominal size
cum
2.05
₹1,400.00
₹2,870.00
0296
Stone Aggregate (Single size) : 12.5 mm nominal size
cum
2.57
₹1,400.00
₹3,598.00
0297
Stone Aggregate (Single size) : 10 mm nominal size
cum
0.81
₹1,400.00
₹1,134.00
2916
Paving Asphalt VG -10 of approved quality
tonne
2.04
₹33,530.00
₹68,401.20
2202
Carriage of Stone aggregate below 40 mm nominal size
cum
24.33
₹0.00
₹0.00
2211
Carriage of Tar bitumen
tonne
2.04
₹0.00
₹0.00
LABOUR
0114
Beldar
day
25
₹736.00
₹18,400.00
for spreading stone metal
0114
Beldar
day
8
₹736.00
₹5,888.00
for hand packing
0114
Beldar
day
4
₹736.00
₹2,944.00
dry rolling
0114
Beldar
day
2
₹736.00
₹1,472.00
/Bajri spreader
0138
Sprayer (for bitumen, tar etc.)
day
1
₹816.00
₹816.00
0114
Beldar
day
2
₹736.00
₹1,472.00
for spreading key aggregate
0114
Beldar
day
10
₹736.00
₹7,360.00
for spraying bitumen
0114
Beldar
day
1
₹736.00
₹736.00
road roller
0128
Mate
day
2.65
₹816.00
₹2,162.40
MACHINERY
0001
Hire charges of Coaltar Boiler 900 to 1400 litres
day
0.5
₹900.00
₹450.00
0003
Hire charges of Diesel Road Roller - 8 to 10 tonne
day
0.75
₹3,350.00
₹2,512.50
9999
Misc. items as spray nozzle, joint paper, coconut oil, country soap etc.
L.S.
429
₹2.27
₹973.83
Rate build-up
TOTAL
₹1,56,924.43
Add 1 % Water charges on "W"
₹1,569.24
TOTAL
₹1,58,493.67
Add GST on "X" (multiplying factor 0.2127)
₹33,711.60
TOTAL
₹1,92,205.27
Add 15% CPOH on "Y"
₹28,830.79
TOTAL
₹2,21,036.06
Add Cess @ 1% on "Z"
₹2,210.36
Cost for 300 Sqm.
₹2,23,246.42
Cost per sqm.
₹744.15
Say
₹744.15