DSR 2023 · SH 9 · WOOD & PVC WORK

CPWD DSR item 9.3.1 rate analysis

Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position with necessary stainless steel screws etc. Sal wood

Published rate₹1,04,754.35per cum
Rate analysis

Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position with necessary stainless steel screws etc.

DSR rate₹1,04,754.35per cum

Sal wood

Item code
9.3.1
Sub-head
SH 9 · WOOD & PVC WORK
Unit
cum
Source row
111

Cost components

CodeDescriptionUnitQuantityRateAmount
Details of cost for ceiling for a room 3x3m
MATERIAL
Salwood = 6x3.30x(50/1000)x(125/1000)=0.1238 cum.
+ Cross battens 60mm centre to center 38x50mm.
6x3x(38/1000)x50/1000)=0.0342 cum.
= 0.1580 cum.+
Add for wastage @ 5% = 0.0079 cum.
= 0.1659 cum. say 166 cudm.
1199 Sal wood in scantling 10 cudm 16.6 ₹600.00 ₹9,960.00
2204 Carriage of Timber cum 0.166 ₹0.00 ₹0.00
LABOUR
0112 Carpenter 2nd class day 1 ₹816.00 ₹816.00
0114 Beldar day 1 ₹736.00 ₹736.00
9999 Sundries screws etc. L.S. 53.82 ₹2.27 ₹122.17

Rate build-up

TOTAL ₹11,634.17
Add 1 % Water charges on "W" ₹116.34
TOTAL ₹11,750.51
Add GST on "X" (multiplying factor 0.2127) ₹2,499.33
TOTAL ₹14,249.84
Add 15% CPOH on "Y" ₹2,137.48
TOTAL ₹16,387.32
Add Cess @ 1% on "Z" ₹163.87
Cost of 158 cudm. ₹16,551.19
Cost per cum. ₹1,04,754.37
Say ₹1,04,754.35