DSR 2023 · SH 4 · CONCRETE WORK

CPWD DSR item 4.13 rate analysis

Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil.

Published rate₹146.15per sqm
Rate analysis

Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil.

DSR rate₹146.15per sqm
Item code
4.13
Sub-head
SH 4 · CONCRETE WORK
Unit
sqm
Source row
1616

Cost components

CodeDescriptionUnitQuantityRateAmount
Details of cost for 10sqm.
MATERIAL
0309 Paving bitumen VG-10 of approved quality tonne 0.017 ₹33,530.00 ₹570.01
0771 Kerosene oil litre 1.23 ₹50.00 ₹61.50
Fuel for heating
0370 Coal (steam) quintal 0.035 ₹500.00 ₹17.50
2211 Carriage of Tar bitumen tonne 0.017 ₹0.00 ₹0.00
LABOUR
Cleaning surface and applying kerosene oil
0114 Beldar day 0.12 ₹736.00 ₹88.32
Heating the material
0115 Coolie day 0.07 ₹736.00 ₹51.52
Spreading hot tar over damp proof course
0131 Painter day 0.2 ₹816.00 ₹163.20
9988 Sundries (Carriage of kerosene, steam coal, brushes, T&P etc.) L.S. 33.15 ₹2.27 ₹75.25

Rate build-up

TOTAL ₹1,027.30
Add 1 % Water charges on "W" ₹10.27
TOTAL ₹1,037.57
Add GST on "X" (multiplying factor 0.2127) ₹220.69
TOTAL ₹1,258.26
Add 15% CPOH on "Y" ₹188.74
TOTAL ₹1,447.00
Add Cess @ 1% on "Z" ₹14.47
Cost for 10 sqm. ₹1,461.47
Cost of 1 sqm. ₹146.15
Say ₹146.15

Use this rate in the interactive workbook

Search, temporarily edit basic rates, recalculate dependencies, and export from the existing DSR workbook.

Open DSR Workbook