Providing and laying four courses water proofing treatment with bitumen felt over roofs consisting of first and third courses of blown bitumen 85/25 or 90/15 conforming to IS : 702 applied hot @ 1.45 Kg per square metre of area for each course, second course of roofing felt type 3 grade-I (hessian based self finished bitumen felt) and fourth and final course of stone grit 6 mm and down size or pea sized gravel spread at 6 cubic decimeter per square metre, including preparation of surface but excluding grading complete with :
Bitumen felt (hessian base) type 3 grade I conforming to IS : 1322
Published rate₹515.05DSR 2023
Rate analysis
Providing and laying four courses water proofing treatment with bitumen felt over roofs consisting of first and third courses of blown bitumen 85/25 or 90/15 conforming to IS : 702 applied hot @ 1.45 Kg per square metre of area for each course, second course of roofing felt type 3 grade-I (hessian based self finished bitumen felt) and fourth and final course of stone grit 6 mm and down size or pea sized gravel spread at 6 cubic decimeter per square metre, including preparation of surface but excluding grading complete with :
DSR rate₹515.05as per item analysis
Bitumen felt (hessian base) type 3 grade I conforming to IS : 1322
Item code
22.8.1
Sub-head
SH 22 · WATER PROOFING
Unit
See analysis
Source row
350
Cost components
Code
Description
Unit
Quantity
Rate
Amount
Detail of cost for 30 sqm
Blown or / and residual bitumen applied hot = 2x1.45x30 = 87 kg
0313
Blown type petroleum bitumen of penetration 85/25 of approved quality
tonne
0.087
₹38,250.00
₹3,327.75
Hession felt type 3 Grade I (hessian base self finished bitumen felt) = 30sqm + Add for over lapping @ 10% = 3 sqm. Total = 33 Sqm
0322
Bitumen felt :Type 3 grade 1
sqm
33
₹80.00
₹2,640.00
1177
Stone grit 6 mm and down size or pea sized gravel
cum
0.18
₹985.00
₹177.30
30x6=180 cudm
2202
Carriage of Stone aggregate below 40 mm nominal size
cum
0.18
₹0.00
₹0.00
2211
Carriage of Tar bitumen
tonne
0.176
₹0.00
₹0.00
I/c Hession felt =0.087t+2.7x0.001x33=0.176t
0370
Coal (steam)
quintal
0.174
₹500.00
₹87.00
= 2 quintals/t of bitumen i.e. 2x0.087 =0.174q
2200
Carriage of steam coal
tonne
0.017
₹0.00
₹0.00
9999
Praparing roof surface, sutting groove and making good etc.
L.S.
134.55
₹2.27
₹305.43
LABOUR
0131
Painter
day
2.16
₹816.00
₹1,762.56
0114
Beldar
day
3.24
₹736.00
₹2,384.64
0130
Mistry
day
0.18
₹897.00
₹161.46
9999
Sundries, brushes etc.
L.S.
6.76
₹2.27
₹15.35
Rate build-up
TOTAL
₹10,861.49
Add 1 % Water charges on "W"
₹108.61
TOTAL
₹10,970.10
Add GST on "X" (multiplying factor 0.2127)
₹2,333.34
TOTAL
₹13,303.44
Add 15% CPOH on "Y"
₹1,995.52
TOTAL
₹15,298.96
Add Cess @ 1% on "Z"
₹152.99
Cost of 30.00 Sqm.
₹15,451.95
Cost of 1.00 Sqm.
₹515.07
Say
₹515.05