DSR 2023 · SH 22 · WATER PROOFING

CPWD DSR item 22.6 rate analysis

Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured.

Published rate₹688.90DSR 2023
Rate analysis

Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured.

DSR rate₹688.90as per item analysis
Item code
22.6
Sub-head
SH 22 · WATER PROOFING
Unit
See analysis
Source row
251

Cost components

CodeDescriptionUnitQuantityRateAmount
Details of cost for 10 sqm
MATERIAL
Cement 10x(1.289+0.488) = 17.77 kg
Sealing fillets @ 10% = 1.77 kg
Total = 19.54kg = 0.020 tonne
0367 Portland Cement (OPC-43 grade) tonne 0.02 ₹5,156.00 ₹103.12
2209 Carriage of Cement tonne 0.02 ₹0.00 ₹0.00
Bonding material 1.6 kgx30x2 = 96 kg
Bitumen (blown/residual type) 10x(0.253+0.67) = 9.23 kg
Wastage @ 5% = 0.46 kg
Total = 9.69 kg
8501 Polymer modified cementation coating kilogram 9.69 ₹170.00 ₹1,647.30
Fibre Glass cloth = 10.00 sqm
Wastage @ 10 % = 1.00 sqm
Total = 11.00 sqm
8502 Fibre glass cloth sqm 11 ₹35.00 ₹385.00
LABOUR
0155 Mason (average) day 2 ₹857.00 ₹1,714.00
0114 Beldar day 1 ₹736.00 ₹736.00
0101 Bhisti day 0.25 ₹816.00 ₹204.00
9999 Sundries, brushes etc L.S. 23.4 ₹2.27 ₹53.12

Rate build-up

TOTAL ₹4,842.54
Add 1 % Water charges on "W" ₹48.43
TOTAL ₹4,890.97
Add GST on "X" (multiplying factor 0.2127) ₹1,040.31
TOTAL ₹5,931.28
Add 15% CPOH on "Y" ₹889.69
TOTAL ₹6,820.97
Add Cess @ 1% on "Z" ₹68.21
Cost for 10 sqm ₹6,889.18
Cost for 1 sqm ₹688.92
Say ₹688.90