DSR 2023 · SH 21 · ALUMINIUM WORK

CPWD DSR item 21.19.3 rate analysis

Filling the gap in between aluminium/ stone/ wood frame and adjacent RCC/Brick/ Stone/ wood/ Ceramic/ Gypsum work by providing weather/structural non sag elastomeric PU sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete, complying to ASTM C920, DIN 18540-F & ISO 11600 Upto 20 mm depth and 20 mm width

Published rate₹363.20per metre
Rate analysis

Filling the gap in between aluminium/ stone/ wood frame and adjacent RCC/Brick/ Stone/ wood/ Ceramic/ Gypsum work by providing weather/structural non sag elastomeric PU sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete, complying to ASTM C920, DIN 18540-F & ISO 11600

DSR rate₹363.20per metre

Upto 20 mm depth and 20 mm width

Item code
21.19.3
Sub-head
SH 21 · ALUMINIUM WORK
Unit
metre
Source row
1172

Cost components

CodeDescriptionUnitQuantityRateAmount
Details of cost for 10m length, width 20mm & depth 20mm
MATERIAL
2604 Weather/structural non sag elastomeric PU sealant (600ml Sausage) for joints in RCC/Brick/ Stone/ wood/ Ceramic/ Gypsum/Alluminium work complying to ASTM C920, DIN 18540-F & ISO 11600 incl all taxes each 3 ₹564.00 ₹1,692.00
8654 Masking tape metre 20 ₹2.00 ₹40.00
2630 Baker rod metre 10 ₹7.00 ₹70.00
9999 Sundries, including charges of Sealant gun machine, dhoti etc L.S. 26 ₹2.27 ₹59.02
9977 Carriage of material L.S. 8.4 ₹2.27 ₹19.07
LABOUR
0123 Mason 1st class day 0.75 ₹897.00 ₹672.75

Rate build-up

TOTAL ₹2,552.84
Add 1 % Water charges on "W" ₹25.53
TOTAL ₹2,578.37
Add GST on "X" (multiplying factor 0.2127) ₹548.42
TOTAL ₹3,126.79
Add 15% CPOH on "Y" ₹469.02
TOTAL ₹3,595.81
Add Cess @ 1% on "Z" ₹35.96
Cost of 10 metre ₹3,631.77
Cost per metre ₹363.18
Say ₹363.20

Use this rate in the interactive workbook

Search, temporarily edit basic rates, recalculate dependencies, and export from the existing DSR workbook.

Open DSR Workbook