2.5 cm thick bitumastic sheet with hot bitumen of approved quality, using stone chippings (60% with 12.5 mm nominal size and 40% with 10 mm nominal size) @ 1.65 cum per 100 sqm and coarse sand @ 1.65 cum per 100 sqm of road surface and with bitumen @ 56 kg/cum of stone chippings and @ 128 kg/cum of sand over a tack coat with hot straight run bitumen, including consolidation with road roller of 8 to 10 tonne etc. complete. (tack coat to be paid separately) :
With paving Asphalt grade VG - 10 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt
Published rate₹353.65per sqm
Rate analysis
2.5 cm thick bitumastic sheet with hot bitumen of approved quality, using stone chippings (60% with 12.5 mm nominal size and 40% with 10 mm nominal size) @ 1.65 cum per 100 sqm and coarse sand @ 1.65 cum per 100 sqm of road surface and with bitumen @ 56 kg/cum of stone chippings and @ 128 kg/cum of sand over a tack coat with hot straight run bitumen, including consolidation with road roller of 8 to 10 tonne etc. complete. (tack coat to be paid separately) :
DSR rate₹353.65per sqm
With paving Asphalt grade VG - 10 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt
Item code
16.38.1
Sub-head
SH 16 · ROAD WORK
Unit
sqm
Source row
2183
Cost components
Code
Description
Unit
Quantity
Rate
Amount
Details of cost for 100sqm.
80/100 bitumen @56kg. per cum. of
aggregate and 128kg. per cum. of sand:
56x1.65=92.4kg. = 0.092t +
128x1.65 = 211.2kg = 0.211t
MATERIAL
2916
Paving Asphalt VG -10 of approved quality
tonne
0.303
₹33,530.00
₹10,159.59
Solvent 0.070 kg. x 303 kg. = 21.21kg
2914
Solvent
kilogram
21.21
₹32.00
₹678.72
2211
Carriage of Tar bitumen
tonne
0.303
₹0.00
₹0.00
2342
Carriage of solvent/ Diesel.
quintal
0.212
₹0.00
₹0.00
2910
Stone chippings/ screenings 12.5/ 13.2 mm nominal size
cum
0.99
₹1,400.00
₹1,386.00
2911
Stone chippings/ screenings 10/ 11.2 mm nominal size
cum
0.66
₹1,400.00
₹924.00
2202
Carriage of Stone aggregate below 40 mm nominal size
cum
1.65
₹0.00
₹0.00
0370
Coal (steam)
quintal
0.606
₹500.00
₹303.00
2200
Carriage of steam coal
tonne
0.061
₹0.00
₹0.00
0982
Coarse sand (zone III)
cum
1.65
₹1,450.00
₹2,392.50
2203
Carriage of Coarse sand
cum
1.65
₹0.00
₹0.00
Labour for cleaning road surface, heating bitumen mixing and spreading aggregate :
(a) For cleaning :
0128
Mate
day
0.16
₹816.00
₹130.56
0114
Beldar
day
1.4
₹736.00
₹1,030.40
0115
Coolie
day
1.4
₹736.00
₹1,030.40
(b) For heating bitumen :
0114
Beldar
day
1.19
₹736.00
₹875.84
(c) For cleaning, mixing and spreading pre-mix aggregate :
0130
Mistry
day
0.24
₹897.00
₹215.28
0114
Beldar
day
6.12
₹736.00
₹4,504.32
(d) Consolidation charges :
0113
Chowkidar
day
0.34
₹736.00
₹250.24
(at barriers for night watch and for road roller)
0101
Bhisti
day
0.13
₹816.00
₹106.08
0003
Hire charges of Diesel Road Roller - 8 to 10 tonne
day
0.13
₹3,350.00
₹435.50
0001
Hire charges of Coaltar Boiler 900 to 1400 litres
day
0.21
₹900.00
₹189.00
0023
Hot Bitumen mixer 0.5 cum i/c hand cart
day
0.05
₹3,950.00
₹197.50
(e) Misc :
Wire brush (with thick wire)
0364
Wire brush
each
0.13
₹25.00
₹3.25
0365
Soft brush
each
0.4
₹25.00
₹10.00
9999
Brooms and gunny bags
L.S.
7.15
₹2.27
₹16.23
9999
Sundries
L.S.
8.97
₹2.27
₹20.36
Rate build-up
TOTAL
₹24,858.77
Add 1 % Water charges on "W"
₹248.59
TOTAL
₹25,107.36
Add GST on "X" (multiplying factor 0.2127)
₹5,340.34
TOTAL
₹30,447.70
Add 15% CPOH on "Y"
₹4,567.16
TOTAL
₹35,014.86
Add Cess @ 1% on "Z"
₹350.15
Cost for 100 sqm.
₹35,365.01
Cost per sqm.
₹353.65
Say
₹353.65
Use this rate in the interactive workbook