Providing and fixing M.S. holder bat clamps of approved design to C.I. or S.C.I. rain water pipes embedded in and including cement concrete blocks 10x10x10 cm of 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and cost of cutting holes and making good the walls etc. : 100 mm diameter

Published rate₹362.85DSR 2023
Rate analysis

Providing and fixing M.S. holder bat clamps of approved design to C.I. or S.C.I. rain water pipes embedded in and including cement concrete blocks 10x10x10 cm of 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and cost of cutting holes and making good the walls etc. :

DSR rate₹362.85as per item analysis

100 mm diameter

Item code
12.38.1
Sub-head
SH 12 · ROOFING
Unit
See analysis
Source row
1954

Cost components

CodeDescriptionUnitQuantityRateAmount
Details of cost of 50 nos.
MATERIAL
1331 M.S.Holder bat clamp of approved design for 100 mm S.C.I. pipe each 50 ₹27.00 ₹1,350.00
C.C. block 50x0.1x0.1x0.1 = 0.05 cum
9977 Carriage of bat clamps L.S. 24.7 ₹2.27 ₹56.07
9999 Sundries L.S. 71.5 ₹2.27 ₹162.31
LABOUR
0116 Fitter (grade 1) day 1.25 ₹897.00 ₹1,121.25
0124 Mason 2nd class day 7.5 ₹816.00 ₹6,120.00
0114 Beldar day 5 ₹736.00 ₹3,680.00
0295 Stone Aggregate (Single size) : 20 mm nominal size cum 0.033 ₹1,425.00 ₹47.03
0297 Stone Aggregate (Single size) : 10 mm nominal size cum 0.011 ₹1,400.00 ₹15.40
2202 Carriage of Stone aggregate below 40 mm nominal size cum 0.044 ₹0.00 ₹0.00
0982 Coarse sand (zone III) cum 0.022 ₹1,450.00 ₹31.90
2203 Carriage of Coarse sand cum 0.022 ₹0.00 ₹0.00
0367 Portland Cement (OPC-43 grade) tonne 0.016 ₹5,156.00 ₹82.50
2209 Carriage of Cement tonne 0.016 ₹0.00 ₹0.00
0114 Beldar day 0.045 ₹736.00 ₹33.12
0115 Coolie day 0.032 ₹736.00 ₹23.55
0101 Bhisti day 0.014 ₹816.00 ₹11.42
0123 Mason 1st class day 0.003 ₹897.00 ₹2.69
0124 Mason 2nd class day 0.003 ₹816.00 ₹2.45
0128 Mate day 0.002 ₹816.00 ₹1.63
9999 Hire charges of machine etc. L.S. 2.6 ₹2.27 ₹5.90
9999 Sundries L.S. 1.3 ₹2.27 ₹2.95
9999 Sundries L.S. 1.3 ₹2.27 ₹2.95

Rate build-up

TOTAL ₹12,753.12
Add 1 % Water charges on "W" ₹127.53
TOTAL ₹12,880.65
Add GST on "X" (multiplying factor 0.2127) ₹2,739.71
TOTAL ₹15,620.36
Add 15% CPOH on "Y" ₹2,343.05
TOTAL ₹17,963.41
Add Cess @ 1% on "Z" ₹179.63
Cost of 50 bat clamps ₹18,143.04
Cost of 1.00 bat clamp ₹362.86
Say ₹362.85